Service-Level Scenarios

Source: Global Test List — TVR 5G-Emerge v3 (Service level tests sheet)

These 16 service-level scenarios define the headline use-case deliverables for Phase 2, each mapped to a specific testbed and satellite segment with quantitative KPI targets. They are drawn from the GTL Service level tests sheet and correspond to the 16 end-to-end service scenarios in TVR §2.8 — Service Scenarios.


Service Level Tests

ID Media Service Use Case Class TN Available? Sat Return? Testbed(s) Satellite Segment Data Rate Latency
1 Linear Direct to Home Yes No SES ASTRA — Receive Only 25 Mb/s 1 s
2 On-Demand Direct to Home Yes No SES ASTRA — Receive Only 25 Mb/s 5 s
3 Linear Direct to Home No Yes EBU-DTH Eutelsat — Bidirectional 25 Mb/s 1 s
4 On-Demand Direct to Home No Yes EBU-DTH Eutelsat — Bidirectional 25 Mb/s 10 s
5 Linear Direct to Vehicle No Yes Viasat ASTRA — Bidirectional 5 Mb/s 2 s
6 On-Demand Direct to Vehicle No Yes Viasat ASTRA — Bidirectional 5 Mb/s 10 s
7 Linear Direct to Vehicle No No LINKS Turin Eutelsat GEO — Receive Only 5 Mb/s 2 s
8 Linear Direct to Edge Yes No EBU-DTE, Arctic Space ASTRA / Space Norway — Receive Only 2 Mb/s 2 s
9 On-Demand Direct to Edge Yes No EBU-DTE, Arctic Space ASTRA / Space Norway — Receive Only 2 Mb/s 2 s
10 Linear Direct to Edge (LEO) Yes Yes Arctic Space Eutelsat LEO — Bidirectional 2 Mb/s 2 s
11 On-Demand Direct to Edge (LEO) Yes Yes Arctic Space Eutelsat LEO — Bidirectional 2 Mb/s 2 s
12 Linear Direct to Edge No No Telenor Maritime Space Norway — Receive Only 10 Mb/s 2 s
13 On-Demand Direct to Edge No No Telenor Maritime Space Norway — Receive Only 10 Mb/s 2 s
14 Linear Direct to Edge No No Rai 5G Broadcast ASTRA — Receive Only 5 Mb/s 2 s
15 Linear Direct to Device Yes Yes MediaTek TBD 0.5 Mb/s 5 s
16 On-Demand Direct to Device Yes Yes MediaTek TBD 0.5 Mb/s 5 s

Notes: All use GSO satellites unless indicated otherwise. Data rate is per single media service ("up to"). Nomadic DTH variants use smaller antennas with proportionally lower gain limits. QoS and QoE targets are TBD across all service tests.


Related Pages

  • Service Scenarios — TVR §2.8 Table 1, the authoritative list of 16 E2E service scenarios
  • E2E Scenarios — TVR §2.9.6 and Appendix 1, the subset confirmed for Phase 2 performance testing
  • Global Test Register — all strand-level test cases (Strands 2–6)